01 / STANDARD DETAILS

Choose the top configuration first.

Cone-top structures form the standard 48–72 inch range. Flat lids are available across the range and become the standard platform for larger diameters. Approved project shop drawings still govern openings, reinforcing and component arrangement.

P3 standard cone-top polymer concrete manhole detail for 48, 60 and 72 inch inside diameters48–72 IN.
01 / ISSUED STANDARD DRAWING

Cone-top standard detail

Standard cone, riser, base, channel, lifting-point and joint arrangement for 48, 60 and 72 inch inside diameters.

P3 standard flat-lid polymer concrete manhole detail for 48 through 120 inch inside diameters48–120 IN.
02 / ISSUED STANDARD DRAWING

Flat-lid standard detail

Standard flat-lid arrangement and key dimensions for 48 through 120 inch inside diameters, including the large-size platform.

Use note. These standard drawings support planning and coordination; they are not project shop drawings. Do not scale them. Confirm the issued project submittal before construction.

02 / DOCUMENT LIBRARY

Go straight to the controlling file.

Open documents in a new tab for review or download the source file. Project specifications, approved submittals and the latest issued manufacturer instructions control.

01
Specifications / CURRENT WEB COMPANIONPolymer concrete manhole specification

Editable Section 33 05 61 contract language for circular precast polymer concrete manholes.

DOCX
02
Specifications / NONCONTRACTUAL COMMENTARYCommentary + specifier guide

Clause-level engineering rationale, coordination notes and references for the companion specification.

DOCX
03
Certifications / ISO 9001:2015 · EXPIRES 07.04.28P3 ISO 9001 certificate

Current certificate for P3 Polymers' quality management system, covering structural polymer fabrication and machining.

PDF
04
Installation / P3 PROCEDURE · REV. 04.21.25P3 handling + installation instructions

Inspection, unloading, rigging, foundation, assembly, connections, backfill and field coordination.

PDF
05
Installation / LIFTING COMPONENT DATAEZ Lift pin data

Embedded lift-pin composition and 4,000 lb working-load reference for lift planning.

PDF
06
Connections / PIPE CONNECTORKor-N-Seal 106 / 406

ASTM C923 connector selection by actual pipe outside diameter, opening and torque guidance.

PDF
07
Connections / LARGE PIPE CONNECTORKor-N-Seal 206

Connector ranges for large pipe, including required opening and minimum structure size.

PDF
08
Joint systems / JOINT GASKETTylox SuperSeal gasket

Pre-lubricated gasket selection, identification, pressure rating and installation sequence.

PDF
09
Joint systems / BUTYL SEALANTConseal butyl sealant

Manufacturer product data for the project-specified butyl joint-sealing system.

PDF
10
Joint systems / ASTM C877 JOINT WRAPConWrap CS-212

Exterior joint-wrap properties, preparation, application and overlap guidance.

PDF
11
Joint systems / ASTM C877 / C923 WRAPInfi-Shield Gator Wrap

External rubber joint wrap with cleaning, overlap and full-circumference application guidance.

PDF
12
Joint systems / HEAT-SHRINK JOINT SEALWrapidSeal encapsulation system

Primer and heat-shrink sleeve system for chimney and barrel joints.

PDF

03 / PROJECT SUBMITTAL

The standard library ends where project coordination begins.

A complete submittal connects the published product platform to actual geometry, loading, interfaces and installation conditions.

01

PROJECT INPUTS

  • Plans, elevations and structure schedule
  • Pipe sizes, materials and outside diameters
  • Loading, groundwater and geotechnical criteria
  • Specified joints, connectors and field testing
02

P3 TECHNICAL RECORD

  • Product data and component arrangement
  • Project-specific shop drawings
  • Structural calculations where required
  • Material qualification and quality records
03

APPROVAL + FIELD HANDOFF

  • Resolved comments and approved drawings
  • Final component IDs, weights and lift points
  • Connector and joint-system schedule
  • Current installation instructions

DOCUMENT CONTROL

Use the current file—and keep it attached to its purpose.

Third-party component literature supports selection and installation of the named accessory; it does not replace the project specification, approved shop drawings, sealed design or P3 installation requirements.

Open the contractor field workflow →