P3 POLYMERS

MANHOLES + WET WELLS / NEW STRUCTURES

Polymer concrete, from top to invert.

A reinforced structural system configured for gravity-flow manholes or pumping wet wells—with corrosion resistance carried through the wall, base, risers and top components.

01 / MANHOLES + WET WELLS

One structural system, configured around the service.

Manholes and wet wells use the same reinforced polymer concrete structure, joints and pipe connections. Manholes are arranged around gravity flow. Wet wells are configured around pumps, operating levels, access and equipment openings.

Standard inside diameters
48–120 in
Material
Polymer concrete throughout
Standard limited warranty
50 years

02 / STANDARD DETAILS

View the standard details.

Select a configuration to review typical geometry, component dimensions and pipe-opening limits. Project drawings confirm the final arrangement.

Standard-size platform

Cone-top structures

48 / 60 / 72" nominal inside diameter

ELEVATION48 / 60 / 72" ID
Elevation view for 48 / 60 / 72 inch manholes
PLAN + BASEAccess, channel + lift points
Access, channel + lift points detail for 48 / 60 / 72 inch manholes
JOINT DETAILStandard shiplap profile
Supplied shiplap joint detail for cone-top structures
STANDARD SPECIFICATION / TABLE 1

Key dimensions and pipe-opening limits.

Pipe limits use actual outside diameter, not nominal pipe size.

MINIMUM NOMINAL MANUFACTURING DIMENSIONSMAX PIPE OD
STANDARD BASE
MAX PIPE OD
EYEBROW BASE
48" ID3" wall 84" max riser 4" base 5" flat top 4" avg. cone
15"31"
60" ID3" wall 84" max riser 4" base 5" flat top 4" avg. cone
17"40"
72" ID3" wall 84" max riser 6" base 6" flat top 4" avg. cone
19"48"

The drawings show standard component dimensions. Pipe layout, elevations, loads and final reinforcing are confirmed for each project.

Discuss a project →

03 / MANHOLE PARTS

Every part has a job.

Select a numbered marker to see how each part works and the standard behind it.

Cutaway manhole showing component and connection locations

04 / INSTALLATION

Different material. Familiar installation.

The pieces arrive ready to set. Installation follows the familiar precast sequence: prepare the base, lift each piece, seal the joints, connect the pipes and backfill.

  1. 01BEFORE SETTING THE BASE

    Prepare a level, fully supported base.

    Control groundwater and confirm stable bedding before setting the first piece.

    CHECKThe ground and bedding are stable, level and ready for the base.
  2. 02BEFORE LIFTING

    Use the marked lifting points.

    Use rated rigging and set each piece in order. Do not lift or support a piece by a joint or pipe opening.

    CHECKThe lifting points, rigging and setting order are confirmed.
  3. 03AT EVERY JOINT

    Clean, seal and fully seat.

    Clean the shiplap, install the specified gasket or sealant and check alignment.

    CHECKThe joint is fully and evenly seated all the way around.
  4. 04BEFORE BACKFILLING

    Connect the pipes and protect the joints.

    Support and align each pipe so it does not bear on the connector, then backfill evenly.

    CHECKThe pipes are aligned and backfill can proceed without moving the manhole.
WHAT CONTRACTORS WILL RECOGNIZE

A familiar precast sequence with no field-applied corrosion lining.

If the project needs extra weight or anchoring against flotation, it is determined before installation.

See installation guidance →

05 / PROJECT FIT

Start with the structure and the conditions.

Share the plans, dimensions, exposure, loading, groundwater or condition information you have. P3 can help determine which product path fits while project design remains with the project engineer.